Skip to content

Explore Genap’s sustainable project portfolio

Discover how Genap tackles real-world challenges with innovative and sustainable solutions. Explore our project portfolio and see how we leverage our expertise to craft tailor-made solutions to meet a variety of challenges.

  • Reset filter
Ditch around polytunnel
Greenhouse Equipment | Wittenberg, Germany

Construction of reservoir, ditches, and trenches for sustainable strawberry cultivation in polytunnels

In collaboration with Greenhouse Equipment, Genap installed a water reservoir, two ditches, and 56 trenches at a fruit and vegetable grower in Wittenberg, Germany. The system collects rainwater from the roofs of the polytunnels and channels it into the water reservoir. This contributes to sustainable open-field strawberry cultivation by making optimal use of rainwater and reducing groundwater consumption.

Water silos Excalibur Plastics Ltd
Excalibur Plastics Ltd | London, Ontario, Canada

Seven water silos for contaminated groundwater

In collaboration with Excalibur Plastics, Genap installed seven water silos in London, Canada, for storing contaminated groundwater, essential for a chemical company's purification process. These sustainable silos, anchored in concrete, highlight efficient placement and collaboration.

Genaflexstore and water reservoirs in Ethiopia
Bosman BV | Debre Zeit, Ethiopia

Eight open and closed water silos in Ethiopia

At the request of C. & J. Bosman, Genap installed both open and closed water storage silos in Ethiopia for a leading Dutch vegetable grower, focusing on sustainability and efficiency. The closed "GenaFlexstores" safeguard drainage water from algae and contamination, significantly reducing the need for disinfection.

Water reservoirs Mastronardi
Stolze Agro International | Coldwater, MI, United States of America

Four water reservoirs at a vegetable grower

Genap has constructed four water storage reservoirs for Mastronardi Produce, the largest vegetable grower in America, at their site in Coldwater, Michigan, incorporating a total of 30,000 square meters of membrane. The prefabrication process allowed for seamless onsite installation, accommodating the varying terrain elevations.