Explore Genap’s sustainable project portfolio
Discover how Genap tackles real-world challenges with innovative and sustainable solutions. Explore our project portfolio and see how we leverage our expertise to craft tailor-made solutions to meet a variety of challenges.

Waste incinerator ash sealing A50
At the Ewijk junction, Genap provided the membrane sealing of incineration bottom ash elevations, using 2mm HDPE membrane and drainage mats for stability. This included waterproof penetrations, totaling 75,000 square meters of materials.

SureGrip concrete protection for a wastewater treatment plant
Genap installed 22,000 square meters of SureGrip concrete protection at the new purification plant in Amsterdam West. Betonson produced tank elements, onto which our custom-made protection plates were mounted. Subsequently, our 22 technicians welded these on-site to ensure they were leak-proof.

Deepened road layout N242
At the sunken eastern ring road N242 in Alkmaar, Genap installed 35,500 square meters of PVC membrane for a viaduct construction. A geotextile was used due to the shell-rich soil. Using a self-developed winch system, the membrane was pulled over water and sunk by its own weight. The leak tightness was subsequently tested by TNO.

Waste incinerator ash sealing on the A2
Genap installed HDPE membrane structures at the Beatrixhaven connection road on behalf of Grondbank Nederland BV to seal incineration bottom ash fillings, thereby protecting the environment. The project included 18,500 square meters of NW20 protection fleece, 18,500 square meters of 2 mm rough HDPE MST/MSB membrane, and
14,000 square meters of drainage mat.