Explore Genap’s sustainable project portfolio
Discover how Genap tackles real-world challenges with innovative and sustainable solutions. Explore our project portfolio and see how we leverage our expertise to craft tailor-made solutions to meet a variety of challenges.
Sixteen underpasses for dual carriageway
For improved access to North-East Friesland, a 24 km long dual carriageway has been constructed between Dokkum Zuid and Nijega. Genap was commissioned to apply geomembrane constructions for all 16 underpasses to keep the passages, which are located below the groundwater level, dry.
Geomembrane sealing on waste-incinerator-ash mounds N18
Genap lined waste incinerator ash at the N18 with membrane, including a mound at exit 26 of the A35, near the Grolsch brewery. This mound required strict IBC measures to prevent environmental damage. The works, carried out according to SIKB guidelines, resulted in a successful and high-quality project.
Water features at Toverland amusement park
Genap, in collaboration with Den Ouden Aannemingsbedrijf, installed membrane constructions for the expansion of Toverland in Sevenum. A total of 15,000 m² of Fecatex PVC membrane and Genatex protective fleece were used, primarily for pond lining. The work progressed smoothly and was completed within four weeks.
Genatop explosion covers on Lipp silos
For Wopereis Staalbouw, Genap has installed a total of 7 silo covers at various locations. The Genatop silo cover has a diameter of 25 meters and is made of high-quality, reinforced membrane.