Skip to content

Aannemersbedrijf Gebr. Van der Lee | Joure, the Netherlands

Sealing membrane on waste Incinerator ash mounds

The project involved applying a sealing membrane to various waste incinerator ash mounds at several viaducts in Joure. This sealing consists of a 2 mm thick HDPE geomembrane, MST+/MSB double-sided textured, with a protective fleece underneath the geomembrane. It was executed on-site by experienced Genap technicians, where the welds meet the KIWA/KOMO certificate BRL K 537 standards. Additionally, about 70 inlets were installed for beacon pockets. The project commenced at the end of 2016, and the membrane-related work was successfully completed in the summer of 2017.